Company in the Oil and Gas Industry
Phase I and II Environmental Assessme

Client: Company in the Oil and Gas Extraction Industry

Location: Targu Jiu, Romania

AUDITECO was retained by a Client from the oil and gas extraction industry to perform Phase I and II Environmental Assessment according to the Ministry Order no. 184/1997 in order to obtain the Environmental Permits for 93 locations.

Phase I Environmental Assessments were developed for the purpose of obtaining information about the causes and the consequences of negative, cumulated, past, present and anticipated effects of the activities performed on the investigated sites.

Phase II Environmental Assessments were developed with a view to investigating all the 93 locations in order to identify their level of contamination with pollutants specific to the onsite activities as well as the main measures necessary for mitigating the negative effects upon the environmental factors. The site investigations included drilling of small and medium depth boreholes (manual and mechanical drillings), equipping some of the boreholes as monitoring wells, collecting a total number of 275 soil samples, 25 groundwater samples and 26 surface water samples.

The documentation was submitted to the Gorj Environmental Protection Agency which, after reviewing it, issued the Environmental Permits for the 93 locations.