Blog

Environmental multinational:
Investigation of potential locations for hazardous waste landfills

AUDITECO was retained by a Client, an environmental multinational from Germany, to perform an investigation of potential locations for hazardous waste landfills for an oil and gas company in Romania.

Afla mai mult!

Real Estate Developer
Residential Complex: Environmental Due Diligence

AUDITECO was retained by a Client from Germany o perform Phase I and II Environmental Site Assessments at the Romanian facility of a manufacturer in the inorganic pigments industry.

Afla mai mult!

Manufacturer in the Energy Industry
Phase I Environmental Due Diligence

AUDITECO was retained by a multinational consulting company from Germany to perform a Phase I Environmental Site Assessment (ESA) for two Romanian facilities of a global manufacturing and technology company from the energy industry, as part of an Environmental Due Diligence (EDD) procedure.

Afla mai mult!

Wind farm developer
Investigation of potential locations for the construction of wind farms

AUDITECO was retained by a Spanish Client for the development of wind farms to identify the most suitable locations for the construction of wind farms in Dobrogea.

Afla mai mult!

Manufacturer in the Chemical Industry
Phase I and II Environmental Site Assessment

AUDITECO was retained by a Client from Germany o perform Phase I and II Environmental Site Assessments at the Romanian facility of a manufacturer in the inorganic pigments industry.

Afla mai mult!

Aerospace Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a multinational consulting and engineering company from UK to perform a Phase I Environmental Site assessment (ESA) for a former industrial facility located in Bucharest, Romania. Following the conclusions of the Phase I ESA report, a Phase II ESA was performed by the Auditeco consultants. The Phase I and II ESAs were developed at the request of a leading global manufacturer from the aero-spatial industry, which intended to extend its production activities on the investigated site.

Afla mai mult!

Wind Farm Developer
Preliminary Environmental Assessment, Phase I Habitat Survey

AUDITECO was retained by a Romanian Client to perform a Biodiversity Presentation Memorandum and Phase I Habitat Survey at a site located in Ialomita County where grain storage silos were going to be built.

Afla mai mult!

Pumps Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a manufacturer of pumps and pumping systems operating in more than 60 countries, headquartered in Germany, to prepare a consolidated Phase I and II environmental assessment, and to coordinate a preliminary geotechnical survey for an undeveloped plot of land located in the proximity of Bucharest, Romania.

Afla mai mult!

Real Estate Developer
Phase I and II Environmental Site Assessment

AUDITECO was retained by GIROM INTERNATIONAL to develop the technical documentation for obtaining the Waste Water Discharge Permit for the activities performed on the company’s site located in Bucharest.

Afla mai mult!

© AUDITECO GES S.R.L. - All Rights Reserved

Web Design by Danco Vision

en_USEnglish (United States)