Electric Power Producer - Technical Documentation for Obtaining the Integrated Environmental Authorisation

  • Electric Power Producer - Technical Documentation for Obtaining the Integrated Environmental Authorisation  imagine 1
  • Electric Power Producer - Technical Documentation for Obtaining the Integrated Environmental Authorisation  imagine 1

Client: S.N.G.N. ROMGAZ S.A

Sector: Electric power producer

Location: Iernut, Romania

Related Services: Site Report for obtaining the Integrated Environmental Authorisation

AUDITECO GES was retained by S.N.G.N. ROMGAZ S.A. to prepare the Technical Documentation for the revision of the Integrated Environmental Authorisation for the Iernut Electricity Production Branch.

The related services consisted of updating the Site Report according to the provisions of the General Technical Guide approved by MO 36/2004. A site visit was performed to obtain all the necessary information for developing the study. The technical documentation was prepared to describe the existing site conditions (including the level of contamination existing on-site) and will represents a benchmark document when the activities on the site are ceased.

The documentation was submitted to the Mures Environmental Protection Agency, which after reviewing it, issued the revised Integrated Environmental Authorisation.