Projects

Environmental multinational:
Investigation of potential locations for hazardous waste landfills

AUDITECO was retained by a Client, an environmental multinational from Germany, to perform an investigation of potential locations for hazardous waste landfills for an oil and gas company in Romania.

Details

Cement Manufacturer
Environmental Compliance Audit

AUDITECO was retained by a multinational consulting company from France to perform a comprehensive Environmental Legal Compliance Audit for a cement manufacturer in the Republic of Moldova.

Details

Grain Storage Silos
Biodiversity Presentation Memorandum

AUDITECO was retained by a Romanian Client to perform a Biodiversity Presentation Memorandum and Phase I Habitat Survey at a site located in Caras-Severin County where grain storage silos were going to be built

Details

Electric Power Supplier
Technical Documentation for Obtaining the Water Management Authorisation

AUDITECO was retained by TRANSELECTRICA S.A. to prepare the technical documentations for obtaining the Water Management Authorisations for six overhead power lines.

Details

Automotive Manufacturer
Environmental, Health and Safety Compliance Audit and Inspection Program

AUDITECO was retained by a multinational consulting company from Germany to perform comprehensive Environmental, Health and Safety legal and corporate compliance audits and inspections for the Romanian facility of a leading manufacturer in the automotive industry, as part of its global corporate audit program.

Details

Real Estate
Site Investigation, Remedial Design and Site Remediation

AUDITECO was retained by a leading international real-estate developer to provide integrated site investigation, technical design and site remediation services at a former industrial site located in Bucharest, Romania.

Details

Real Estate Developer
Residential Complex: Environmental Due Diligence

AUDITECO was retained by a Client from Germany o perform Phase I and II Environmental Site Assessments at the Romanian facility of a manufacturer in the inorganic pigments industry.

Details

Manufacturer in the Energy Industry
Phase I Environmental Due Diligence

AUDITECO was retained by a multinational consulting company from Germany to perform a Phase I Environmental Site Assessment (ESA) for two Romanian facilities of a global manufacturing and technology company from the energy industry, as part of an Environmental Due Diligence (EDD) procedure.

Details

Manufacturer in the Energy Industry
Phase I and II Environmental Site Assessment

AUDITECO was retained by a multinational consulting company from Germany to perform a legal and corporate Environmental Compliance Audit for the Romanian facilities of a leading global manufacturing and technology company from the energy industry, as part of its global corporate audit program.

Details

Local Real Estate Developer
Subsoil Investigation Report

AUDITECO was retained by a local real estate developer operating in the central part of Romania to perform a detailed subsoil investigation at a former industrial compound located in the proximity of Brasov, Romania.

Details

Company in the Oil and Gas Industry
Phase I and II Environmental Site Assessment for 5 oil mines in Romania

AUDITECO was retained by a Client operating in the oil and gas sector to perform Phase I and II Environmental Assessment according to Ministry Order 184/2007 for 5 oil mines.

Details

EBRD Project
Technical Assistance A3 Motorway (Comarnic – Brasov)

AUDITECO was retained by a Client from UK in order to evaluate the compliance level of the Environmental and Social Impact Assessment (ESIA) study for the construction of a section of the A3 motorway. The project was financed by the European Bank for Reconstruction and Development.

Details

Aeronautics Manufacturer
Technical Documentation for Obtaining the Integrated Environmental Authorisation

AUDITECO was retained by a Romanian aeronautics manufacturer to prepare the Technical Documentation for obtaining the Integrated Environmental Authorisation for the activities performed at the site in Bucharest.

Details

Wind farm developer
Investigation of potential locations for the construction of wind farms

AUDITECO was retained by a Spanish Client for the development of wind farms to identify the most suitable locations for the construction of wind farms in Dobrogea.

Details

Solar Park Developer:
Appropriate Assessment for a Solar Park

AUDITECO was retained by a Client to perform an Appropriate Assessment for a for a solar park.

Details

Grain Storage Silos
Biodiversity Presentation Memorandum

AUDITECO was retained by a Romanian Client to perform a Biodiversity Presentation Memorandum and Phase I Habitat Survey at a site located in Ialomita County where grain storage silos were going to be built.

Details

Ecological Reconstruction
Environmental Impact Assessment for a Wetland Restauration Project

AUDITECO was retained by a Client to perform an Environmental Impact Assessment for a project of ecological restauration of a former wetland transformed into an agricultural land.

Details

Decorative Mosaic Producer
Technical Documentation for Obtaining the Waste Water Discharge Permit

AUDITECO was retained by GIROM INTERNATIONAL to develop the technical documentation for obtaining the Waste Water Discharge Permit for the activities performed on the company’s site located in Bucharest.

Details

Manufacturer in the Chemical Industry
Phase I and II Environmental Site Assessment

AUDITECO was retained by a Client from Germany o perform Phase I and II Environmental Site Assessments at the Romanian facility of a manufacturer in the inorganic pigments industry.

Details

Automotive Manufacturer
Environmental, Health and Safety Compliance Audit

AUDITECO was retained by a multinational consulting company from USA to perform a comprehensive Environmental, Health and Safety Legal and Corporate Compliance Audit for the Romanian facilities of a leading manufacturer in the automotive industry, as part of its global corporate audit program.

Details

Aerospace Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a multinational consulting and engineering company from UK to perform a Phase I Environmental Site assessment (ESA) for a former industrial facility located in Bucharest, Romania. Following the conclusions of the Phase I ESA report, a Phase II ESA was performed by the Auditeco consultants. The Phase I and II ESAs were developed at the request of a leading global manufacturer from the aero-spatial industry, which intended to extend its production activities on the investigated site.

Details

Pumps Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a manufacturer of pumps and pumping systems operating in more than 60 countries, headquartered in Germany, to prepare a consolidated Phase I and II environmental assessment, and to coordinate a preliminary geotechnical survey for an undeveloped plot of land located in the proximity of Bucharest, Romania.

Details

Electric Power Producer
Technical Documentation for Obtaining the Integrated Environmental Authorisation

AUDITECO was retained by S.N.G.N. ROMGAZ S.A. to prepare the Technical Documentation for the revision of the Integrated Environmental Authorisation for the Iernut Electricity Production Branch.

Details

Wind Farm Developer
Preliminary Environmental Assessment, Phase I Habitat Survey

AUDITECO was retained by a Romanian Client to perform a Biodiversity Presentation Memorandum and Phase I Habitat Survey at a site located in Ialomita County where grain storage silos were going to be built.

Details

Telecommunications Service Provider
Technical Documentation for Obtaining the Water Management Authorisation

AUDITECO was retained by Radiocomunicatii S.A. to prepare the technical documentation for obtaining the Water Management Authorisation for the site located in Tancabesti.

Details

Logistics Service Provider
Application for Obtaning a Water Management Permit

AUDITECO was retained by ILR Logistica Romania SRL, a European provider of logistics services, to prepare the application documents for the issuance of a Water Management Permit, as part of the permitting procedure for the construction of a multimodal freight terminal within the port of Giurgiu, Romania.

Details

Solar PV Farm Developer
Biodiversity Presentation Memorandum

AUDITECO was retained by the company Urbanscapes Growth to perform an Environmental Due Diligence at a site located in Corbeanca, Romania where a residential complex was going to be developed.

Details

Real Estate Developer
BREEAM Assessment Ecology Report for an Office Building in Ploiesti

AUDITECO was retained by a real estate developer in order to prepare an Ecology Report according to BREEAM Europe Commercial 2009 for an office building to be built on a site in Ploiesti.

Details

Real Estate Developer
BREEAM Assessment Ecology Report for an Office Building in Bucharest

AUDITECO was retained by a real estate developer in order to prepare an Ecology Report according to BREEAM Europe Commercial 2009 for an office building to be built on a site in Bucharest.

Details

Real Estate Developer
Subsoil Investigation Report

AUDITECO was retained by a leading real estate developer to perform a detailed subsoil investigation at a former industrial compound located in Bucharest, Romania.

Details

Real Estate Developer
Remedial Design and Soil Remediation

AUDITECO was retained by an important real estate developer to provide integrated site investigation, technical design and soil remediation services at a former industrial site located in the northern part of Bucharest, Romania.

Details

Real Estate Developer
Phase I and II Environmental Site Assessment

AUDITECO was retained by GIROM INTERNATIONAL to develop the technical documentation for obtaining the Waste Water Discharge Permit for the activities performed on the company’s site located in Bucharest.

Details

Real Estate Developer
Technical Documentation for Obtaining the Water Management Authorisation

AUDITECO was retained by a real-estate company to prepare the technical documentation for obtaining the Water Management Authorisation for an office assembly located in Voluntari (Ilfov district).

Details

Danube Delta
Environmental Impact Assessment: Sulina-Cardon-Popina-Periprava Channels’, Tulcea County.

AUDITECO was retained by a Client to perform an Environmental Impact Assessment for the project ‘Dragging and maintenance works for the channels in Danube Delta: Sulina-Cardon-Popina-Periprava Channels’, Tulcea County.

Details

Danube Delta
Environmental Impact Assessment
Dunavat-Dranov Aquatic Complex, Tulcea County

AUDITECO was retained by a Client to perform an Environmental Impact Assessment for the project ‘Improving the environmental conditions in the areas used for reproduction by native species of fish from Dunavat-Dranov aquatic complex’, Tulcea county.

Details

Certified training
"Environmental Auditor" (COR: 325703)

AUDITECO organised a certified training course "Environmental Auditor" for the M.Sc. students of the Faculty of Geography within Bucharest University.

Details

Training course
"SEVESO III Directive"

AUDITECO organized a training course on the newly implemented ‘SEVESO III DIRECTIVE’ for the employees VEOLIA ENERGIE PRAHOVA.

Details

Natural Gas Transportation Company
Appropriate Assessment for a Natural Gas Pipeline Repairing Project

AUDITECO was retained by a Client to perform an Appropriate Assessment for a project focused on repairing a segment of a transit natural gas pipeline.

Details

Construction company
Remedial Design and Site Remediation

AUDITECO was retained by a leading international construction company to provide technical remediation design and site remediation supervision at an undeveloped site located in Bucharest, Romania.

Details

Company in the Oil and Gas Industry
Phase I and II Environmental Assessme

AUDITECO was retained by a Client from the oil and gas extraction industry to perform Phase I and II Environmental Assessment according to the Ministry Order no. 184/2007 in order to obtain the Environmental Permits for 93 locations.

Details

Oil and Gas Company
Phase I Environmental Site Assessments for obtaining Environmental Permits

AUDITECO was retained by a Client from the oil and gas extraction industry to perform Phase I Environmental Assessment according to the Ministry Order no. 184/2007 in order to obtain the Environmental Permits for 43 sites.

Details

Local Public Administration
Environmental Report for the Master Urban Planning of Malu

AUDITECO was retained by a Client to perform an Environmental Report for the Master Urban Planning of Malu Commune, Giurgiu County, in order to obtain the Environmental Permit.

Details

Natural Gas Transportation Company
Appropriate Assessment for a Natural Gas Pipeline Repairing Project

AUDITECO was retained by a Client to perform an Appropriate Assessment for a project focused on repairing a segment of a transit natural gas pipeline.

Details

Nutritional Products
Technical Documentation for Obtaining the Water Management Permit

AUDITECO was retained by a Client in the field of the nutritional product manufacturing to develop the Technical Documentation for Obtaining the Water Management Permit for one of its location near Bucharest, Romania.

Details

© AUDITECO GES S.R.L. - All Rights Reserved

Web Design by Danco Vision

en_USEnglish (United States)