Blog

Aerospace Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a multinational consulting and engineering company from UK to perform a Phase I Environmental Site assessment (ESA) for a former industrial facility located in Bucharest, Romania. Following the conclusions of the Phase I ESA report, a Phase II ESA was performed by the Auditeco consultants. The Phase I and II ESAs were developed at the request of a leading global manufacturer from the aero-spatial industry, which intended to extend its production activities on the investigated site.

Afla mai mult!

Automotive Manufacturer
Environmental, Health and Safety Compliance Audit

AUDITECO was retained by a multinational consulting company from USA to perform a comprehensive Environmental, Health and Safety Legal and Corporate Compliance Audit for the Romanian facilities of a leading manufacturer in the automotive industry, as part of its global corporate audit program.

Afla mai mult!

Electric Power Producer
Technical Documentation for Obtaining the Integrated Environmental Authorisation

AUDITECO was retained by S.N.G.N. ROMGAZ S.A. to prepare the Technical Documentation for the revision of the Integrated Environmental Authorisation for the Iernut Electricity Production Branch.

Afla mai mult!

Pumps Manufacturer
Phase I and II Environmental Site Assessment

AUDITECO was retained by a manufacturer of pumps and pumping systems operating in more than 60 countries, headquartered in Germany, to prepare a consolidated Phase I and II environmental assessment, and to coordinate a preliminary geotechnical survey for an undeveloped plot of land located in the proximity of Bucharest, Romania.

Afla mai mult!

Wind Farm Developer
Preliminary Environmental Assessment, Phase I Habitat Survey

AUDITECO was retained by a Romanian Client to perform a Biodiversity Presentation Memorandum and Phase I Habitat Survey at a site located in Ialomita County where grain storage silos were going to be built.

Afla mai mult!

Telecommunications Service Provider
Technical Documentation for Obtaining the Water Management Authorisation

AUDITECO was retained by Radiocomunicatii S.A. to prepare the technical documentation for obtaining the Water Management Authorisation for the site located in Tancabesti.

Afla mai mult!

Logistics Service Provider
Application for Obtaning a Water Management Permit

AUDITECO was retained by ILR Logistica Romania SRL, a European provider of logistics services, to prepare the application documents for the issuance of a Water Management Permit, as part of the permitting procedure for the construction of a multimodal freight terminal within the port of Giurgiu, Romania.

Afla mai mult!

Solar PV Farm Developer
Biodiversity Presentation Memorandum

AUDITECO was retained by the company Urbanscapes Growth to perform an Environmental Due Diligence at a site located in Corbeanca, Romania where a residential complex was going to be developed.

Afla mai mult!

Real Estate Developer
Subsoil Investigation Report

AUDITECO was retained by a leading real estate developer to perform a detailed subsoil investigation at a former industrial compound located in Bucharest, Romania.

Afla mai mult!

© AUDITECO GES S.R.L. - All Rights Reserved

Web Design by Danco Vision

en_USEnglish (United States)